Discovery & export mapping
Document every entity in scope and the canonical export from the current platform.
The migration schema is used as a checklist and the scope is reviewed before data moves.
SWITCHING · MIGRATION PLAYBOOK
Cortex handles mapping assistance, staging gives your team a place to validate, and the parallel run creates an explicit verification window before AdaptixCore becomes the system of record. The cadence below is the designed program structure, not a fabricated customer average.
CUTOVER READINESS
5 PHASESThe timeline is the program design. It is not presented as a measured average across existing customers.
WHAT THE MIGRATION LANE OWNS
01
We move the data. You do not have to build the migration spreadsheet yourself.
02
Migration is included in the AdaptixCore commercial path rather than becoming a separate implementation project.
03
Field-level translation is mapped and then reviewed instead of silently assumed.
04
The migration lane stays active after go-live so cutover issues have an explicit owner.
05
The migration scope can include calls, charts, claims, crew records, and other agreed historical entities.
06
The cutover plan can preserve a defined read-only legacy window rather than forcing an immediate hard stop.
STAGED BEFORE PRODUCTION
Migration path
Cortex assists with field-by-field mapping, and the workflow validates on a staged copy before production cutover.
Document every entity in scope and the canonical export from the current platform.
The migration schema is used as a checklist and the scope is reviewed before data moves.
Map source entities into the AdaptixCore data model and flag differences for human review.
The mapping report remains reviewable. Ambiguous fields are resolved with the operating team rather than guessed.
Load historical data into an isolated staging tenant for spot checks and reconciliation.
Production does not become the validation environment. The staged copy is approved first.
Run the old and new workflows in parallel for the agreed verification window.
If a mismatch appears, the cutover can pause while the mapping or workflow is corrected.
Switch the system of record on the agreed date after staged and parallel validation are accepted.
The support lane remains available through the initial production period instead of disappearing at cutover.
USE THE EXPORT YOU ACTUALLY HAVE